Owned test kit. Not hired in.
We self-perform HV construction, protection, testing and commissioning from 11 kV to 132 kV, and we say plainly what we subcontract or leave to the network operator.
Four disciplines between the network and the load.
Construction
Protection & control
Commissioning
Testing & maintenance
Plant, tooling, and the limits we state.
Substations and switchyards, self-performed to 132 kV.
Customer and zone substations at 11, 22 and 33 kV with AIS and GIS installation and transformers to 100 MVA, plus 66 and 132 kV AIS switchyards with earth grids to ENA EG-1. 275 kV is partnered from Year 2.


The test lab behind every energisation.
Primary and secondary injection, VLF, partial discharge and transformer testing run from a 500 m² lab at Wacol on equipment we own, so test dates are ours to schedule. Network settings come from the network operator; we implement and prove them.
Limits stated up front.
Overhead lines, civils, steel, foundations and cranes are subcontracted or out of scope. 66–132 kV jointing is by OEM jointers, 275 kV is partnered from Year 2 and DGA is by a NATA lab. We say this at tender, not at claim time.

Every test we run is recorded and handed over. Nothing is asserted.
Owned, calibrated equipment means every injection, VLF and PD result traces to a test record and a settings file. What we hand over is what the asset did on the day, not what the drawings promised.

Owned, calibrated, on our schedule.
Four numbers describe the test equipment in the year-one capital plan. It is committed spend, not a claim about past use, and nothing here is hired in to meet a date.
What a test record shows before we energise.


Scope and limits.
Scope as planned for launch. Package-specific scope is confirmed at tender.